Loading
- Dock-high count, truck approach, turnaround radius
- Grade-level count, ramp slope, door dimensions
- Drive-in vs back-in dock configuration
- Trailer parking depth and security
- Dock seals and levelers, condition
Clear height + structure
- Real usable height under joists and ducts (not advertised)
- Column spacing and bay depth for your equipment
- Roof condition, age, remaining warranty
- Floor slab rating (lbs/sq.ft.) for your inventory
- Crane rail capacity (if applicable)
Power + utilities
- Amperage and voltage (current and upgrade capacity)
- Three-phase availability
- Sub-panel layout and capacity for new equipment
- Sprinkler type and density (ESFR vs standard)
- Gas service and capacity
- Drainage, sewer connection, oil interceptor
Yard + parking
- Yard size, fencing condition, drainage
- Parking stall count and accessibility
- Customer drop-off vs employee separation
- Security: lighting, cameras, fence access points
Zoning + entitlement
- Permitted use exactly matches yours
- Additional use rights for future operations
- Redevelopment risk in the area
- Heritage or character restrictions
- Setback / coverage limits if you expand
"A generic I-2 zoning won't save you if your use isn't actually permitted."
Operating economics
- Realistic operating cost vs marketing pro-forma
- Property tax assessment trajectory
- Insurance class and replacement cost
- Capex required in the next 5 years (roof, HVAC, dock, paving)
Take the next step
Send a property and we'll evaluate it against this framework. Confidential.
Get a Building Read